Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Foshan Renchang Chemical Co., Ltd., Guangdong Province

Magnesium alloy surface treatment series, aluminum alloy electroplating serie...

sell
  • There is no classification
contact
  • Contact:冯兰兰
  • Phone:86-0757-81796851
search
 
link
  • There is no link yet
home > sell > Aluminum alloy alkaline chemical nickel
Aluminum alloy alkaline chemical nickel
products: Views:5Aluminum alloy alkaline chemical nickel 
brand: 仁昌
包装: 桶装
规格: 25kg/桶
price: 面议
MOQ: 1 千克
Total supply: 10000000 千克
Delivery date: Shipped within 2 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-01-16 15:27
 
Details
.Process features: , Aluminum alloy alkaline electroless nickel is an electroless nickel that is particularly suitable for aluminum and aluminum alloy pre-plating
b. Reduce contamination of subsequent acidic electroless plating or other electroplating solutions
, Excellent bonding force
/>, the processing of complex workpieces shows its superiority
, can also be used for the electroplating base layer of other substrates
, low operating temperature
Instructions for use
Aluminum alloy alkaline pretreatment Nickel plating uses the internationally accepted three solutions, B and B. Open the cylinder with B and analyze the consumed components of the replenishing working fluid according to the nickel ion concentration. Replenish with, it is extremely convenient:
.Plating solution composition And operating conditions:
Raw materials and operations
Unit
Range
Aluminum alloy alkaline chemical nickel
(Volume ratio)

Aluminum alloy alkali Chemical nickel
(Volume ratio)




Temperature

Room temperature ℃
Loading capacity< br/>

Time
Minutes
- Minutes

3. Prepare the solution:
When opening the cylinder, add the prepared solution/water into the tank.
Add the added B and B, stir evenly mechanically, and filter with a filter.
Add pure water to approximate required volume.
Use ammonia water to adjust the value to . (approximately ml), add water to the scale, and then plating according to process requirements.
.Equipment requirements
Project requirements
Tank body, or high-density
hanger, or type 3 stainless steel. Make sure the workpiece is vertical in the bath, and the minimum distance between two adjacent plates is
The main and auxiliary air mixing tanks should have moderate and uniform air stirring
3 cycles per hour
Add system Required, the material of the feeding pump is, or, can withstand strong alkali
The filtration system continuously circulates filtration, using filter cotton core or filter bag
Ventilation is needed
Heating system is needed
Request for quotation
A total of0articles  Related Comments: